The sump in the box gutter, which is connected to the downpipe. The sump drains the water out of the box gutter and through the downpipe, which is connected to the legal point of discharge.

The apex of the roof is usually the point where the two beams meet and slope in the opposite direction also known as a ridge. The universal beams are the structural components that hold the roof up. The two beams are connected with a welded plate and bolts. Above the universal beams are c-purlins connected to the beams with fly-bracing and welded cleats. There is bridging in between the purlins to avoid deflection of the purlins. Above the purlins in safety mesh and sisalation.
This photo demonstrates the joint between two concrete panels above an opening. The construction joint must be maintained in order to prevent any leakage into the building. The joint is made up of a backing rod and then a mastic sealant applied over. This joint is applied to both sides of the panel (internal & external). The internal application is for fire resistance and the external is for weather sealing.Article #3
Article #2
Figure borrowed from: http://www.deir.qld.gov.au/workplace/law/codes/construction/tiltup/deadman/index.htm
The panels have side, front and top facing assembly handles, these offer attachement points for the crane in order to make transportation, handling and erection possible. The reinforcement in the pre-cast panels provide sufficient shear and tensile strength to avoid cracks in the panels during the installation process. The panels are inset 125mm from the outer edge of the strip-footing. After the panels are placed into position they are levelled out with packers before applying the slurry.
Article #1

The plumbing can be seen in the background, with the exposed ends having PVC safety caps on to protect it from external elements entering the pipes; this avoids blockage of the pipes. All plumbing is placed within close vicinity of each other, thus allowing easy connection and reduction in cost. Temporary fencing can also be seen in the background, which by law should be surrounding the entire construction zone. There is compressed crushed rock that has been laid out, which the concrete will be poured over after the TM has been placed, the compressing machine is also seen in the background.